Bocac is an 110MW hydro power project. It is located on Vrbas river/basin in Central Bosnia, Bosnia and Herzegovina. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1981. Buy the profile here.
Description
The project is currently owned by Elektroprivreda Republike Srpske.
Bocac is a reservoir based project. The hydro reservoir capacity is 52.1 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number. The project generated 308 GWh of electricity.
The hydro power project consists of 2 turbines, each with 55MW nameplate capacity.
Development status
The project got commissioned in 1981.
Contractors involved
Koncar Generators and Motors supplied 2 electric generators for the project. The generator capacity is 65 MVA.
For more details on Bocac, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.