Turu is a 100MW hydro power project. It is planned on Dikrong river/basin in Arunachal Pradesh, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. The project construction is likely to commence in 2027 and is expected to enter into commercial operation in 2030. Buy the profile here.
Description
The project is being developed by Turu Hydro Energy. ECI Engineering & Construction and KVK Energy & Infrastructure are currently owning the project.
Turu is a run-of-river project. The net head of the project will be 176.32m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 2 in number. The penstock length will be 20m. The penstock diameter will be 2.1m.
The project will have 2 electric generators installed at the project site. The generator capacity is likely to be 36.67 MVA.
Development status
The project construction is expected to commence from 2027. Subsequent to that it will enter into commercial operation by 2030.
For more details on Turu, buy the profile here.