Wada is a 165.8MW hydro power project. It is located on Wadagawa river/basin in Toyama, Japan. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1959.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 165.8 | 165.8 | – | Active | Toyama, Japan |
---|
Description
The project is currently owned by Hokuriku Electric Power.
The hydro reservoir capacity is 222 million cubic meter.
Wada (Wada-1) consists of 2 units of pelton turbines.
Wada (Wada-2) consists of 2 units of pelton turbines.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe Wada (Wada-1) has 2 electric generators installed at the site.
The Wada (Wada-2) has 2 electric generators installed at the site. The generator capacity is 70 MVA.
Development Status
The project got commissioned in 1959.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.