Elecgas (Pego) Combined Cycle Power Plant is an 836MW gas fired power project. It is located in Santarem, Portugal. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2010.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 836 | 836 | – | Active | Santarem, Portugal |
---|
Description
Endesa Generacion, Engie and Marubeni are currently owning the project having ownership stake of 50%, 25% and 25% respectively.
It is a Combined Cycle Gas Turbine (CCGT) power plant.
The project cost is $775.63m.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project got commissioned in December 2010.
Power Purchase Agreement
The power generated from the project is sold to Endesa Generacion under a power purchase agreement for a period of 25 years.
Contractors Involved
Siemens was selected to render EPC services for the gas fired power project.
Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block I) is equipped with Siemens SGT5-4000F, V94.3A gas turbine. The phase consists of 1 gas turbine.
Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block I) is equipped with Siemens Single Flow, 2-Case, H&E-Type steam turbine. The phase consists of 1 steam turbine.
Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block II) is equipped with Siemens SGT5-4000F, V94.3A gas turbine. The phase consists of 1 gas turbine.
Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block II) is equipped with Siemens Single Flow, 2-Case, H&E-Type steam turbine. The phase consists of 1 steam turbine.
Siemens supplied 3-Phase, Radial, Hydrogen Cooled electric generator for the Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block I).
Siemens supplied 3-Phase, Radial, Hydrogen Cooled electric generator for the Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block II).
Siemens Heat Transfer Technology supplied steam boiler for the Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block I).
Siemens Heat Transfer Technology supplied steam boiler for the Elecgas (Pego) Combined Cycle Power Plant (Elecgas (Pego) Combined Cycle Power Plant Block II).
PEGOP – Energia Electrica is the O&M contractor for thermal power project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.