Atria Wind Farm-Betul is a 99.5MW onshore wind power project. It is located in Madhya Pradesh, India. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2014.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 99.5 | 99.5 | – | Active | Madhya Pradesh, India | Atria Power |
---|
Description
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project was developed by Atria Power. Atria Power and GE Energy Financial Services India are currently owning the project.
The Atria Wind Farm-Betul (Atria Wind Farm-Betul I), has 85m high towers.
The Tubular Steel towers installed at the Atria Wind Farm-Betul (Atria Wind Farm-Betul II), site are 104m high.
Development Status
The project is currently active. The project got commissioned in December 2014.
Power Purchase Agreement
The power generated from the Atria Wind Farm-Betul (Atria Wind Farm-Betul I) is sold to Madhya Pradesh Power Transmission under a power purchase agreement for a period of 25 years. The contracted capacity is 30MW.
Contractors Involved
Siemens Gamesa Renewable Energy was selected to render EPC services for the Atria Wind Farm-Betul (Atria Wind Farm-Betul II).
Atria Wind Farm-Betul (Atria Wind Farm-Betul I) is equipped with Regen Powertech VENSYS 82 turbines. The phase consists of 33 turbines with 1.5MW nameplate capacity.
Atria Wind Farm-Betul (Atria Wind Farm-Betul II) is equipped with Siemens Gamesa Renewable Energy G97-2.0 MW turbines. The phase consists of 25 turbines with 2MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.