Bundang Combined Cycle Power Plant is a 922MW gas fired power project. It is located in Gyeonggi, South Korea. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in September 1993.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 922 | 922 | – | Active | Gyeonggi, South Korea |
---|
Description
The project is currently owned by Korea South-East Power.
It is a CCGT with Cogen power plant that is used for Peakload. The power plant run on dual-fuel. The primary fuel being used to power the plant is liquefied natural gas. In case of shortage of liquefied natural gas the plant can also run on Diesel.
Development Status
The project got commissioned in September 1993.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Hyundai Engineering was selected to render EPC services for the gas fired power project.
Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 185MW nameplate capacity.
Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block I) is equipped with GE Power GT11NM gas turbines. The phase consists of 5 gas turbines with 77.8MW nameplate capacity.
Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 115MW nameplate capacity.
Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block II) is equipped with GE Power GT11NM gas turbines. The phase consists of 3 gas turbines with 77.8MW nameplate capacity.
GE Power supplied electric generator for the Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block I).
GE Power supplied electric generator for the Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block II).
GE Power supplied steam boiler for the Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block I).
GE Power supplied steam boiler for the Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.