Red Oak Power Plant is a 966MW gas fired power project. It is located in New Jersey, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in March 2002.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 966 | 966 | – | Active | New Jersey, the US |
---|
Description
The project is currently owned by Red Oak Power with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The fuel is procured from PSE&G – Red Oak Line.
The project generated 4,939,221MWh of electricity.
Development Status

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataThe project got commissioned in March 2002.
Contractors Involved
Washington Group International was selected to render EPC services for the gas fired power project.
The Gas fired project have been supplied by Siemens and Toshiba Energy Systems and Solutions.
Siemens Energy supplied electric generator for the project.
Amec Foster Wheeler supplied steam boiler for the project.
NAES is the O&M contractor for thermal power project. The operation and maintenance contract commenced from 2017, for a period of 5 years.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.