West Lunga Solar PV Park is a 54.3MW solar PV power project. It is located in Lusaka, Zambia. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in March 2019.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 54.3 | 54.3 | – | Active | Lusaka, Zambia | Bangweulu Power; First Solar; Neoen |
---|
Description
The project was developed by Bangweulu Power, First Solar and Neoen. The project is currently owned by Bangweulu Power with a stake of 100%.
West Lunga Solar PV Park is a ground-mounted solar project which is spread over an area of 52 hectares.
The project generates 100,000MWh electricity and supplies enough clean energy to power 30,000 households, offsetting 19,000t of carbon dioxide emissions (CO2) a year. The project cost is $60m.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project got commissioned in March 2019.
Power Purchase Agreement
The power generated from the project is sold to ZESCO under a power purchase agreement. The power is sold at the rate of $0.06kWh for a period of 25 years. The contracted capacity is 47.5MW.
Contractors Involved
Sterling and Wilson Solar was selected to render EPC services for the solar PV power project.
First Solar was selected as the supplier of the PV modules for the project. The company installed 453,000 modules at the site.
Bangweulu Power and Sterling and Wilson Solar were contracted to render operations & maintenance services for the project.
About Bangweulu Power
Bangweulu Power Corporation Limited, a special purpose vehicle owned by a consortium comprising Neoen/First Solar and the Industrial Development Corporation of Zambia (IDC).
About First Solar
First Solar Inc (First Solar) is a provider of solar photovoltaic (PV) systems. It designs, manufactures and sells PV solar modules. The company produces solar systems using cadmium telluride technology. First Solar also offers solar PV power systems, and operations and maintenance services to system owners; and energy storage solutions and algorithms to design and simulate the optimal dispatch of a system. The company serves utilities, commercial and industrial companies, independent power producers, and other system owners in Asia Pacific, Europe, the Middle East, Africa and North America. It has solar module manufacturing facilities in the US, Malaysia, Germany and Vietnam. First Solar is headquartered in Tempe, Arizona, the US.
About Neoen
Neoen SA (Neoen) is a renewable energy company. The company carries out the development and design; construction project management, finance, and maintenance of renewable energy power plants. In addition, it monitors the construction work of power plants. It generates electricity from various renewable energy sources including solar, wind, and biomass. The company operates solar PV farms in France and lithium-ion power reserve in Hornsdale, Australia. It has operations in Ireland, Australia, Portugal, France, Mexico, El Salvador, Argentina, Zambia, Finland, and Mozambique. Neoen is headquartered in Paris, Ile-de-France, France.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.