Bagistas is a 140MW hydro power project. It is located on Bagistas river/basin in Erzincan, Turkey. The project is currently active. It has been developed in single phase. The project construction commenced in 2011 and subsequently entered into commercial operation in 2014.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 140 | 140 | – | Active | Erzincan, Turkey |
---|
Description
The project is currently owned by IC Ictas Enerji Uretim ve Ticaret.
The project generated 520 GWh of electricity. The project cost is $338m.
The hydro power project consists of 3 turbines, each with 48MW nameplate capacity.
The project has 3 electric generators installed at the site. The generator capacity is 19 MVA.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataDevelopment Status
The project construction commenced in 2011 and subsequently entered into commercial operation in 2014.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.