Sir is a 284MW hydro power project. It is located on Ceyhan river/basin in Adana, Turkey. The project is currently active. It has been developed in single phase. The project construction commenced in 1987 and subsequently entered into commercial operation in 1991.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 284 | 284 | – | Active | Adana, Turkey |
---|
Description
The project is currently owned by Devlet su Isleri Genel Mudurlugu.
The hydro reservoir capacity is 1,120 million cubic meter. The project generated 725 GWh of electricity.
Development Status
The project construction commenced in 1987 and subsequently entered into commercial operation in 1991.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Toshiba Energy Systems and Solutions was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 94.6MW nameplate capacity.
Toshiba Energy Systems and Solutions supplied electric generator(s) for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.