Hebei Zhongjieneng Zhangbei Manjing Wind Farm is a 193.5MW onshore wind power project. It is located in Hebei, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2005.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 193.5 | 193.5 | – | Active | Hebei, China | Zhangbei Guotou Windfarm |
---|
Description
The project was developed by Zhangbei Guotou Windfarm and is currently owned by China Energy Conservation Investment.
Development Status
The project is currently active. The project got commissioned in December 2005.
Contractors Involved
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataHebei Zhongjieneng Zhangbei Manjing Wind Farm (Hebei Zhongjieneng Zhangbei Manjing Wind Farm Phase-1A) is equipped with GE Renewable Energy 1.5s turbines. The phase consists of 6 turbines with 1.5MW nameplate capacity.
Hebei Zhongjieneng Zhangbei Manjing Wind Farm (Hebei Zhongjieneng Zhangbei Manjing Wind Farm Phase-1B) is equipped with GE Renewable Energy 1.5s turbines. The phase consists of 24 turbines with 1.5MW nameplate capacity.
Hebei Zhongjieneng Zhangbei Manjing Wind Farm (Hebei Zhongjieneng Zhangbei Manjing Wind Farm Phase-2) is equipped with Nordex turbines. The phase consists of 33 turbines, each with 1.5MW nameplate capacity.
Hebei Zhongjieneng Zhangbei Manjing Wind Farm (Hebei Zhongjieneng Zhangbei Manjing Wind Farm Phase-3A) is equipped with Zhejiang Windey Wind Generating Engineering turbines. The phase consists of 23 turbines, each with 0.75MW nameplate capacity.
Hebei Zhongjieneng Zhangbei Manjing Wind Farm (Hebei Zhongjieneng Zhangbei Manjing Wind Farm Phase-3B) is equipped with Zhejiang Windey Wind Generating Engineering turbines. The phase consists of 66 turbines, each with 0.75MW nameplate capacity.
Hebei Zhongjieneng Zhangbei Manjing Wind Farm (Hebei Zhongjieneng Zhangbei Manjing Wind Farm Phase-4A) is equipped with Zhejiang Windey Wind Generating Engineering WD49-750 turbines. The phase consists of 26 turbines with 0.75MW nameplate capacity.
Hebei Zhongjieneng Zhangbei Manjing Wind Farm (Hebei Zhongjieneng Zhangbei Manjing Wind Farm Phase-4B) is equipped with Zhejiang Windey Wind Generating Engineering turbines. The phase consists of 17 turbines, each with 0.75MW nameplate capacity.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.