Tyin is a 374MW hydro power project. It is located on Tyin river/basin in Vestland, Norway. The project is currently active. It has been developed in single phase. The project construction commenced in 1910 and subsequently entered into commercial operation in 1944.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 374 | 374 | – | Active | Vestland, Norway |
---|
Description
The project is currently owned by Norsk Hydro with a stake of 100%.
The hydro reservoir capacity is 369 million cubic meter. The project generated 1,573 GWh of electricity.
Development Status
The project construction commenced in 1910 and subsequently entered into commercial operation in 1944.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
Rainpower was selected as the turbine supplier for the hydro power project. The company provided 1 unit of pelton turbine with 190MW nameplate capacity.
GE Renewable Energy supplied 2 electric generators for the project. The generator capacity is 220 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.