Bemposta is a 431MW hydro power project. It is located on Douro river/basin in Braganca, Portugal. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2011.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 431 | 431 | – | Active | Braganca, Portugal | EDP Gestao da Producao de Energia |
---|
Description
The project was developed by EDP Gestao da Producao de Energia. Engie and Mirova are currently owning the project having ownership stake of 40% and 25% respectively.
Bemposta is a run-of-river project.
Development Status
The project got commissioned in 2011.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Bemposta (Bemposta I) is equipped with Alstom francis turbines. The phase consists of 3 turbines with 80MW nameplate capacity.
Bemposta (Bemposta II) is equipped with Andritz Hydro francis turbine. The phase consists of 1 turbine with 191MW nameplate capacity.
Alstom supplied electric generator(s) for the Bemposta (Bemposta I). The generator capacity is 78 MVA.
Andritz Hydro supplied 1 electric generator for the Bemposta (Bemposta II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.