Lanco Kondapalli Combined Cycle Power Plant is a 1,476.14MW gas fired power project. It is located in Andhra Pradesh, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2000. Buy the profile here.
Description
The project is currently owned by Lanco Kondapalli Power with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The fuel is procured from GAIL (India) Limited, Reliance Industries Limited.
Development status
The project got commissioned in October 2000.
Power purchase agreement
The power generated from the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I) is sold to Transmission Corporation of Andhra Pradesh under a power purchase agreement for a period of 15 years. The contracted capacity is 368.14MW.
Contractors involved
Lanco Infratech was selected to render engineering procurement construction services for the gas fired power project.
Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 128.99MW nameplate capacity.
Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I) is equipped with GE Power 9E.03 gas turbines. The phase consists of 2 gas turbines with 119.577MW nameplate capacity.
Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II) is equipped with GE Power 9F gas turbine. The phase consists of 1 gas turbine.
Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II) is equipped with Harbin Electric Multi casing Design Condensing steam turbine. The phase consists of 1 steam turbine.
Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I) is equipped with GE Power 9F gas turbine. The phase consists of 1 gas turbine with 241MW nameplate capacity.
Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I) is equipped with Harbin Electric Multi casing Design Condensing steam turbine. The phase consists of 1 steam turbine with 130MW nameplate capacity.
Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II) is equipped with GE Power 9F gas turbine. The phase consists of 1 gas turbine with 241MW nameplate capacity.
Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II) is equipped with Harbin Electric Multi casing Design Condensing steam turbine. The phase consists of 1 steam turbine with 130MW nameplate capacity.
GE Power supplied electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I).
Harbin Electric supplied Air-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II).
GE Power supplied Hydrogen-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II).
Harbin Electric supplied Air-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I).
GE Power supplied Hydrogen-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I).
Harbin Electric supplied Air-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II).
GE Power supplied Hydrogen-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II).
Hanjung Power supplied steam boiler for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I).
Thermax supplied steam boiler for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II).
Thermax supplied steam boiler for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I).
Thermax supplied steam boiler for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II).
Genting Lanco Power (India) is the O&M contractor for thermal power project.
For more details on Lanco Kondapalli Combined Cycle Power Plant, buy the profile here.