Chespi is a 468MW hydro power project. It is planned on Guayllabamba river/basin in Pichincha, Ecuador. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the dormant stage. It will be developed in a single phase. Buy the profile here.
Description
The project is being developed and currently owned by HidroEquinoccio EP.
Chespi is a reservoir based project. The hydro reservoir capacity is planned to be 2.3 million cubic meter. The gross head of the project will be 278.5m. The penstock length will be 1,000m. The penstock diameter will be 4m. The project is expected to generate 2,000 GWh of electricity.
The hydro power project consists of 4 turbines, each with 117MW nameplate capacity.
For more details on Chespi, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.