Navajo Pumped Hydro Facility is a 2,230MW hydro power project. It is planned on Powell river/basin in Utah, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2026 and is expected to enter into commercial operation in 2030. Buy the profile here.
Description
The project is being developed and currently owned by Daybreak Power.
Navajo Pumped Hydro Facility is a pumped storage project. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 8 in number. The penstock diameter will be 3.353m. The project is expected to generate 3,365 GWh of electricity.
The hydro power project consists of 8 units of pump turbines.
Development status
The project construction is expected to commence from 2026. Subsequent to that it will enter into commercial operation by 2030.
For more details on Navajo Pumped Hydro Facility, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.