Atyrau – Ulke Line is a 500kV overhead line from Atyrau, Atyrau, Kazakhstan, to Ulke, Almaty, Kazakhstan.
The project is expected to be commissioned in 2025.
Description
Atyrau – Ulke Line is an overhead line that will be operated by Kazakhstan Electricity Grid Operating. The line will carry alternating current (AC) through single circuit cable.
Approximately $196.3m was financed by the authorities to undertake the construction works of the project.
Atyrau – Ulke Line project development status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe construction works on the Atyrau – Ulke Line project will be commenced in 2021 and commissioning is expected in 2025.
About Kazakhstan Electricity Grid Operating
Kazakhstan Electricity Grid Operating Company (KEGOC) is an operator of transmission grid. The company’s activities include system service provider of electricity transmission in the national power grid on the contractual basis; provides system services for technical dispatching through centralised operational dispatch control of operating conditions in the Unified Energy System of Kazakhstan; and render system services of balancing electricity generation and consumption.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.