Vyskov – Cechy Stred Line is a 400kV overhead line with a length of 98.3km from Vyskov, South Moravian, Czech Republic, to Cechy Stred, Czech Republic.
Construction works on the Vyskov – Cechy Stred Line started in 2015 and the project was commissioned in 2016.
Description
The Vyskov – Cechy Stred Line, which is an overhead line, is being operated by CEPS. The Vyskov – Cechy Stred Line is an upgrade line. The line carries alternating current (AC) through double circuit cable.
Approximately $115.7m was financed by the authorities to undertake the construction works of the project.
Vyskov – Cechy Stred Line project development status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe development of the Vyskov – Cechy Stred Line project was approved by The Energy Regulatory Office in 2015 and the project works were completed in 2016.
About CEPS
CEPS A.S. (CEPS) is a state-controlled electric utility that develops, operates and maintains the Czech transmission system. It is responsible for balancing the supply of electricity with demand. CEPS transmits electricity from generators to distributors in the domestic market, or exports to/imports from abroad. The company is also responsible for allocating the available transfer capacity on international cross-border power lines through auctions. Its dispatch control services include operational planning, real-time control and operational evaluation. The company is responsible for developing the transmission system to meet the future electricity demand.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.