Branch River – Point Beach Line is a 345kV overhead line with a length of 3.2km from Branch River, Manitowoc County, Wisconsin, US, to Point Beach, Wisconsin, US.
Construction works on the Branch River – Point Beach Line started in 2017 and the project was commissioned in 2018.
Description
The Branch River – Point Beach Line, which is an overhead line, is being operated by American Transmission. The Branch River – Point Beach Line is a new line. The line carries alternating current (AC) through double circuit cable.
Branch River – Point Beach Line project development status
The development of the Branch River – Point Beach Line project was approved by Public Service Commission of Wisconsin in 2017 and the project works were completed in 2018.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataAbout American Transmission
American Transmission Company LLC (ATC), a subsidiary of WEC Energy Group Inc is an electric transmission service provider that owns, operates and builds electric transmission lines. The company’s transmission system allows energy producers to transport electric power. It offers electric transmission service in an area from the Upper Peninsula of Michigan, throughout the eastern half of Wisconsin and into portions of Illinois. ATC’s projects include Quad County Electric Reliability Project, Spring Valley-North Lake Geneva Electric Reliability Project and Badger Coulee Transmission Line Project, among others. The company operates in Minnesota, Illinois, Wisconsin, and Michigan, the US.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.