Moro Substation is a 500/220kV substation located in Moro, Sindh, Pakistan. The construction works on Moro Substation began in 2016. The project was commissioned in 2017.
Description
The Moro Substation project is a new substation being operated by National Transmission & Despatch.
The designed voltage level of the project is 500/220kV, while the operating voltage level is 500/220kV.The step-in voltage of the substation is 500kV and the step-out voltage is 220kV. The substation capacity is 1,500MVA.
Moro Substation has received approval from Water and Power Development Authority,Pakistan to undertake the works on the project.Approximately $269m was financed by the authorities for the construction works of the project.
About National Transmission & Despatch
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataNational Transmission & Despatch Co Ltd (NTDC) operates as an electric utility that generates, transmits, dispatch and distributes electricity. The company operates and maintains a network of grid stations and transmission lines. Its services offerings include planning and design, operations and maintenance, monitoring and testing, pre-commissioning test, technical analysis, technical auditing, thermovision survey and technical training services. NTDC also provides online bill payment, rebates and incentives, electrical safety, energy conservation, outage reporting, load management, energy assistance and meter reading services.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.